We make bored foundation from 300 - 800 mm in diameter. Foundation length – up to 12 m. Installation of bored poles is performed using the CFA (Continuous Flight Auger) method. This method allows installing foundation in any type of soil and guarantee an efficient, mechanised and reliable way for pile installation.